I just downloading this programme a few days ago and was checking it out. Although mostly everything worked great I did have an issue with scheduling however not what others have had.
My schedule jobs work to a point.
I made up 3 folders in My Doc. called Test 1; Test 2 and Test 3. Inside each of them i did a few text messages just to make sure the folders had something in them.
Now manually works like a charm this included part of the scheduling too with shutdowns and startups with on schedule in bettween. So it was like this Test 1; schedule within 10 - 15 minutes. Test 2 when I shutdown programme. and test 3 when I start up programme. Now when I checked these on the CD-RW all 3 tests were there.
Here is my issue:
I tried to do all 3 test folders on a schedule same day just to test it out. Test 1 in 15 minutes and then test 2 half hour later and test 3 an hour later. The schedule times all started up that is not my issue. What is is the fact that after Test 1 was done and I checked to see if on CD which it was but after Test 2 was done when I checked the CD now my test 1 disappeared, And so forth!
No I do not have the check mark to erase before backing up. that would really defeat my purpose of backing up various folders at different times.
It is set as user backup and not service backup but when I changed that well it wouldn't work at all. I also have my computer settings as classic on Win XP and I am the only user / owner / admin. So that may be why not sure but it works when in user backup. And like I said schedule works find except for the glitch in which it for some reason erases the other folders before copying the next folder.
Manually it doesn't do that.
So I hope you could help me out I am at a lost! And this programme is user friendly not like most I have to us.